Overhead Aerial Bundled Cable 3*70 Alu NFC 33-209 ABC Cable
| Application: | Overhead Distribution Line | Cores Nos: | 1,2,3,4 More Multicore |
| Rated Voltage: | 15/35kV | Installation Degree: | -20℃-90℃ |
| Neutral Messengers: | AAC, AAAC Or ACSR | Insulation: | PE/PVC |
| High Light: | Overhead aerial bundled cable 3*70 Alu,ABC cable with NFC 33-209 standard,Aluminum overhead bundled cable 3*70 |
||
Overhead Aerial Bundled Cable 3*70 Alu NFC 33-209 ABC Cable
Deatils
Insulation : XLPE/PE
Rated Voltage : 0.6/1KV
Cores : 1,2,3,4,5,2+1, 3+1 ,3+2, 4+1, 4+2 Cores
Other Standards: ASTM/ BS 7870-5/ IEC 60502/AS/NZS or according to your requirement.
Application: The aerial bundled cables designed for overhead distribution lines have all conductors made of aluminium,
insulated with XLPE.Phase and neutral cores are laid up in a bundle with a left hand lay. Can be used for fixed installation as overhead power lines up to 1000V
Construction

Specification
Contact us for more details
About us

Projects

Package

Partners


FAQ
(1).When can I get the price?
We usually quote within 6 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your e-mail so that we will regard your inquiry priority.
(2).How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. Sample is free, but the freight charge should be paid.
(3).How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days. You can use your own express account or prepay us if you do not have an account.
(4).What about the lead time for mass production?
Honestly, it depends on the order quantity and the season you place the order.The best record we keep is delivering 10 kilometers cable within a week. Generally speaking, we suggest that you start inquiry two months before the date you would like to get the products at your country.
(5).What is your payment term ?
Our payment term is usually T/T 30% in advanced, the balance before shipping or L/C at sight.
-
Ca new design cable for our projects, good quality
-
Tperfect