| Lugar de origem: | Hebei,China |
|---|---|
| Marca: | Medium Voltage Wire |
| Certificação: | ISO,CCC,TUV,CE,VDE |
| Número do modelo: | Média Tensão |
| Quantidade de ordem mínima: | Negociável |
| Preço: | Negociável |
| Detalhes da embalagem: | Tambor de madeira de aço |
| Tempo de entrega: | 10 dias |
| Termos de pagamento: | L/C,T/T |
| Habilidade da fonte: | 100km/semana |
| Material de isolamento: | XLPE | Aplicativo: | Ferrovia Industrial Subterrânea |
|---|---|---|---|
| Material condutor: | Cobre | Bainha: | PVC |
| Núcleos: | 1 núcleo, 3 núcleos | Armadura: | Fita de aço blindada |
These cables are used for electricity supply in medium voltage installation system, they are suitable for installation in indoors and outdoors, in cable ducts, underground, in power and switching stations, local energy distributions, industrial plants, where there is no risk of mechanical damage.
Voltage Rating Uo/U: 12/20kV
Maximum operating temperature of conductor:+90℃
Operating ambient temperature: -15℃~+55℃
Cable laying temperature:Not less than 0℃(When the ambient temperature is below 0℃, the cable should be preheated.)
Minimum Bending Radius: Single core:15D Multicire: 12D (D is the actual outer diameter of the cable)
|
Specs |
Conductor diameter |
Outer thickness of insulation |
Approx outer diameter of cable |
Approx cable weight |
|
Specs |
Conductor diameter |
Outer thickness of insulation |
Approx outer diameter of cable |
Approx cable weight |
|
1×35 |
6.6±0.2 |
20.0 |
27.2 |
1167 |
3×35 |
6.6±0.2 |
20.0 |
54.1 |
3935 |
|
|
1×50 |
7.6±0.2 |
21.0 |
28.2 |
1319 |
3×50 |
7.6±0.2 |
21.0 |
56.6 |
4480 |
|
|
1×70 |
9.2±0.2 |
22.6 |
30.0 |
1589 |
3×70 |
9.2±0.2 |
22.6 |
60.2 |
5336 |
|
|
1×95 |
10.9±0.2 |
24.3 |
31.7 |
1897 |
3×95 |
10.9±0.2 |
24.3 |
64.2 |
6387 |
|
|
1×120 |
12.2±0.2 |
25.6 |
33.2 |
2186 |
3×120 |
12.2±0.2 |
25.6 |
67.3 |
7326 |
|
|
1×150 |
13.6±0.2 |
27.0 |
35.9 |
2821 |
3×150 |
13.6±0.2 |
27.0 |
70.6 |
8340 |
|
|
1×185 |
15.2±0.2 |
28.6 |
37.6 |
3250 |
3×185 |
15.2±0.2 |
28.6 |
74.5 |
9705 |
|
|
1×240 |
17.4±0.2 |
30.8 |
40.0 |
3888 |
3×240 |
17.4±0.2 |
30.8 |
81.0 |
12490 |
|
|
1×300 |
19.5±0.2 |
32.9 |
42.5 |
4583 |
3×300 |
19.5±0.2 |
32.9 |
85.9 |
14635 |
|
|
1×400 |
22.0±0.2 |
35.4 |
45.1 |
5467 |
3×400 |
22.0±0.2 |
35.4 |
91.9 |
17515 |
|
|
1×500 |
24.8±0.2 |
39.0 |
49.1 |
6677 |
3×500 |
24.8±0.2 |
39.0 |
100.2 |
21345 |
|
|
1×630 |
28.2±0.2 |
42.4 |
52.8 |
8180 |
3×630 |
28.2±0.2 |
42.4 |
108.1 |
26055 |
|
|
1×800 |
34.0±0.2 |
48.2 |
58.8 |
10265 |
|
|
|
|
|
![]()
![]()
![]()
![]()
1.What is our payment term?
Our payment term is T/T 30% advanced, then the balance paid before picking up the goods or L/C at sight.
Classificação geral
Instantâneo de classificação
A seguir está a distribuição de todas as classificaçõesTodos os comentários